How the way a plant manufactures shapes planning, shop-floor execution and period-end costing in SAP S/4HANA.
Overview
Product costing in SAP follows the way a plant manufactures. Two choices shape it:
- The manufacturing type decides which object collects the costs.
- The planning strategy decides what triggers production.
| Manufacturing type | Costs collected on | Costing approach |
|---|---|---|
| Discrete | Production order | Product cost by order |
| Process (PP-PI) | Process order | Product cost by order |
| Repetitive (REM) | Product cost collector | Product cost by period |
Manufacturing types
Three ways to run production in SAP, each with its own order type, master data and typical industries.
- PP
Discrete manufacturing
Built on production orders. Products are assembled and can be disassembled.
How it works
- Planning and execution run through production orders
- Components are issued to the production order
- Products and variants change often
- Production runs on different lines and work centers
- Costing and settlement happen on the production order
Master data
- Bill of materials
- Routing
- Work center
- Production version
Typical industries
Mechanical engineering (cars, aircraft), consumer goods, electronics
- PP-PI
Process manufacturing
Built on process orders. Batch-oriented production with PP-PI (Production Planning for Process Industries).
How it works
- Batch-oriented production
- The master recipe is copied into the process order and adjusted to actual production
- Process management links PP-PI to process control while the order runs
- Costing and settlement happen on the process order
Master data
- Master recipe
- Resource
- Bill of materials
- Production version
Typical industries
Pharmaceutical, chemical, food, beverage
- REM
Repetitive manufacturing
Built on planned orders. The same products run repetitively or continuously on a production line.
How it works
- Production is driven by planned orders, planned period by period
- Runs repetitively on a single production line
- Simpler backflushing at confirmation
- Costing and settlement happen on the product cost collector
- Best for stable products, high repetition and low complexity
Master data
- Product cost collector
- Rate routing
- REM profile
- Production version
Typical industries
High-volume consumer goods, electronics, automotive components
Planning strategies: MTS vs MTO
The strategy decides what triggers production. Both work with discrete and process manufacturing.
Make to stock (MTS)
Production follows a sales forecast. Finished goods go to stock, and sales orders are served from that stock.
Demand created with
MD61- Planned independent requirements
Make to order (MTO)
Production is triggered by a customer sales order. The product is made for that order and its stock is tied to the sales order item.
Demand created with
VA01- Sales order
MD81- Customer independent requirement
Process steps: from demand to order close
The order-based flow for discrete and process manufacturing, in 14 steps. Switch the order type to see the matching transactions.
Showing production order transactions (discrete, PP).Showing process order transactions (process industry, PP-PI).
Demand and MRP
Create demand
Make to stock: planned independent requirements. Make to order: the customer sales order or a customer independent requirement.
- MTS
MD61 - MTO
VA01 - MTO
MD81
- MTS
Check demand
Stock/requirements list
MD04
Run MRP
MRP Live creates the planned orders
MD01N
Production orderProcess order
Create the order
Convert the planned order, one or many at once, or create the order manually
MD04- Convert
CO40 - Convert
COR7 - Collective
CO41 - Collective
COR8 - Manual
CO01 - Manual
COR1
Release the order
CO02COR2
Goods issue to the order
Movement type 261
MIGO
Confirm the order
CO11NCOR6N
Goods receipt from the order
Movement type 101
MIGO
Technically complete (TECO)
CO02COR2
Period-end costing
Overhead calculation
- Individual
KGI2 - Collective
CO43
- Individual
Work in process (WIP)
- Individual
KKAX - Collective
KKAO
- Individual
Variance calculation
- Individual
KKS2 - Collective
KKS1
- Individual
Settlement
- Individual
KO88 - Collective
CO88
- Individual
Close the order
Sets the status CLSD
CO02COR2
Individual or collective: each period-end step runs for one order or for many orders at once.
Repetitive manufacturing follows a different, period-based flow on the product cost collector, so it is not covered here.